Solar PV – Commercial Sector

Our client is an commercial building with purpose built premises and modern service facilities. LCS Energy having completed an LED installation in 2016 were requested to review the site and recommend a technology that would contribute to the dealership’s ongoing objectives of reducing energy bills, decreasing CO2 emissions and providing a sustainable energy supply.

The system design of the 28kWp system was challenging from conception. As well as being restricted on export to the grid, the installation was carried out over two different roofs all with different building material and ages. Special consideration had to be made to not only to the roofing structures but also to the logistical requirement of the business operation. LCS Energy completed the installation and commissioned on 31st March 2017 and fulfilling all of the customer objectives.

The system cost of £26,100 is expected to pay back within five years with 100% of generation being consumed by the site.

Solar PV Case Study Graph